Public contracts of Celles-sur-Belle · 2024 · Other
Maîtrise d’oeuvre pour le diagnostic et la restauration de l’abbaye royale
That is at most ~€65k a year on average: a maximum too.
Who won it
E3F-Ingenierie en Électricité Eclairage Énergie FluidesIngénierie, études techniques · registered office Saint-Georges-Les-Baillargeaux (86130) · headcount 6 to 9 employees · SIREN 343540936A contract awarded to 5 holders; above, the main holder. With it: Cabinet Dubois, Arc&sites Architectes du Patrimoine Poitiers, SBC (Structure Bois Conseil), C.I.D (Capture Inspection Diagnostic) (Capture Inspection Diagnostic). The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 4 by amount of the 6 contracts Celles-sur-Belle published for 2024.
Contract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.