Travaux de mise aux normes PMR de l’école élémentaire Paul cézanne: Lot 1: TRAVAUX DE MACONNERIE ET DERIVES

Number 12 by amount of the 19 contracts Chantilly awarded in 2020.

Contract · Construction and Bâtiment · carried out in 60500

43k €
contract ceiling — what was paid on it is not published
Signed on 4 May 2020 · ended around August 2020 · 0.2 yrs
Ended3 Aug 2020

Who won it

FlamantSIREN 413396185

The competition

Number of bids not published for that year: the field is only systematic from 2024.

Adapted procedure · awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

View the consolidated DECP (data.gouv.fr) ↗

The form of the contract

PriceFerme et actualisable
Published amendmentsnone

Other contracts of Flamant in Chantilly

Lot 7 cloisons doublage réhabilitation vestiaires stade202567k€Extension et restructuration des vestiaires du stade des Bourgognes à Chantilly: Lot 7: Cloisons doublages202361k€Extension du réfectoire de l’école maternelle des Tilleuls: Lot 4: CLOISONNEMENT / ISOLATION / FAUX PLAFOND20197k€

Marchés de plus de 40 000 € HT déclarés à la notification (DECP) : montants des contrats, pas les paiements. Les plus petits marchés ne sont pas publiés ; les montants manifestement erronés sont écartés.