Public contracts of Châteauneuf-sur-Loire · 2023 · Construction and buildings

Construction d’un pôle de santé enfance famille

€1.2M
maximum contract amount over 15 months — what was paid on it is not published
Signed on 29 September 2023 · ended around December 2024 · 15 months

That is at most ~€965k a year on average: a maximum too.

Company selected

Entreprise Blot FilsTravaux de démolition · registered office Vennecy (45760) · headcount 20 to 49 employees · SIREN 328825161

A contract awarded to a consortium of 5 holders; above, the main holder. With it: Slvi, Alp Architecture, Madera, Ingenierie Diagnostics Études Structures (Ides). The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 2 by amount of the 38 contracts Châteauneuf-sur-Loire published for 2023.

Other contracts of Entreprise Blot Fils in Châteauneuf-sur-Loire

Travaux création espace associatif gabereau2024 · maximum over 9 months158€kCréation espace associatif gabereau2024 · maximum over 9 months158€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.