Skip to main content

Public contracts of Cheval-Blanc · 2019 · Construction and buildings

Mas st paul

Chauffage

€74k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 4 February 2019 · ended around March 2020 · 13 months

That is at most ~€68k a year on average: a maximum too.

Company selected

ThermatexTravaux d'installation d'équipements thermiques et de climatisation · registered office Le Thor (84250) · headcount 3 to 5 employees · SIREN 538166034

Number 9 by amount of the 15 contracts Cheval-Blanc published for 2019.

Other contracts of Thermatex in Cheval-Blanc

Aménagement et extension du Mas Saint-Paul2019 · maximum over 10 months68€kClimatisation salle moulin et CSU2019 · maximum over 1 month40€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.