Supplier of Claye-Souilly · Construction and buildings
Tassone Bâtiment
Tassone Bâtiment holds one public contract awarded by Claye-Souilly in 2024. That is 16% of the value of the contracts the town awarded in 2024.
head office in Brie-Comte-Robert (77) · 3 to 5 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 403469299
€660k
at most, over the whole term of the contracts awarded by Claye-Souilly in 2024
What Tassone Bâtiment does in Claye-Souilly
Maximum amount of each contract, over its whole term: not what was paid.
Réhabilitation du groupe scolaire Maryse Bastié2024 · maximum over 5 months · Simplified procedure€660k