Supplier of Claye-Souilly · Construction and buildings
EMA Design
EMA Design holds one public contract awarded by Claye-Souilly in 2019. That is 11% of the value of the contracts the town awarded in 2019.
head office in Montfermeil (93) · Commerce de détail d'autres équipements du foyer · SIREN 849121678
€92k
at most, over the whole term of the contracts awarded by Claye-Souilly in 2019
Its contracts in Claye-Souilly
Maximum amount of each contract, over its whole term: not what was paid.
Fourniture de mobilier fixe et de bureau:-14 B2019 · maximum over 12 months · Simplified procedure€92k