Supplier of Cognac · Construction and buildings
Toit'Avenir
Toit'Avenir holds 2 public contracts awarded by Cognac in 2025. That is 4% of the value of the contracts the town awarded in 2025.
head office in Cognac (16) · 10 to 19 employees · Travaux de couverture par éléments · SIREN 434227369
€302k
at most, over the whole term of the contracts awarded by Cognac in 2025
Its contracts in Cognac
Maximum amount of each contract, over its whole term: not what was paid.
Réfection de la couverture2025 · maximum over 16 months · at most ~€113k a year on average · Open tender€151kGS Simone Veil site de Châtenay PrimaireTravaux de couverture et de traitement des bois de charpente · 2025 · maximum over 12 months · Simplified procedure€151k