Public contracts of Coignières · 2023 · Construction and buildings

Réhabilitation et extension du groupe scolaire G. Bouvet

€324k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 15 December 2023 · ended around July 2025 · 19 months

That is at most ~€204k a year on average: a maximum too.

Company selected

Egb Électricité Fluide Énergie Regulation ThermiqueTravaux d'installation électrique dans tous locaux · registered office Ivry-La-Bataille (27540) · headcount 10 to 19 employees · SIREN 802296954

Number 12 by amount of the 32 contracts Coignières published for 2023. It belongs to the policy Schools.

Other contracts of Egb Électricité Fluide Énergie Regulation Thermique in Coignières

Travaux de réhabilitation et d’extension du groupe scolaire Gabriel…2023 · maximum over 18 months324€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Unitaire

Published amendments : 3

Subcontracting declared : no