Mur de soutènement n°103-réhabilitation du mur de soutènement

Rue du florimont

€114k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 4 November 2021 · ended around January 2022 · 2 months

Company selected

Sogea Est BTP (Muller Travaux Hydrauliques d'Alsac)Construction de réseaux pour fluides · registered office Laxou (54520) · headcount 250 to 499 employees · SIREN 413909201

Number 42 by amount of the 86 contracts Colmar published for 2021. It belongs to the policy Streets and transport.

Other contracts of Sogea Est BTP (Muller Travaux Hydrauliques d'Alsac) in Colmar

Réhabilitation de l’ouvrage d’art OA 26, rue Aristide Briand…2023 · maximum over 1 month56€kConstruction d’un ouvrage d’art sur le Logelbach2022 · maximum over 3 months215€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.