Voie de liaison entre la rue Ledru Rollin (RD33) et la rue Édouard Herriot, carrefour modifié

€501k
maximum contract amount over 5 months — what was paid on it is not published
Signed on 31 May 2021 · ended around October 2021 · 5 months

Company selected

Pigeon TP Centre Ile-de-FranceConstruction de routes et autoroutes · registered office Cherre-Au (72400) · headcount 100 to 199 employees · SIREN 382495646

The largest of the 3 contracts Connerré published for 2021.

Other contracts of Pigeon TP Centre Ile-de-France in Connerré

Réfection piste de roller2025 · maximum over 7 months47€kVoie de liaison entre la rue Ledru Rollin (RD33) et la rue Édouard…2021 · maximum over 5 months251€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 2

The 2 lots : 251 €k · 251 €k