Skip to main content

Public contracts of Culoz-Béon · 2022 · Construction and buildings

Travaux de réhabilitation de la toiture et des façades du gymnase jean falconnier et Construction d’un local de stockage attenant

Façades enduites

€15k
maximum contract amount over 17 months — what was paid on it is not published
Signed on 17 May 2022 · ended around October 2023 · 17 months

That is at most ~€11k a year on average: a maximum too.

Company selected

SAS Fernandez DorregoTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Arbent (01100) · headcount 20 to 49 employees · SIREN 384261079

Number 10 by amount of the 13 contracts Culoz-Béon published for 2022. It belongs to the policy Culture, sport and youth.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.