Skip to main content

Public contracts of Dembeni · 2020 · Construction and buildings

Extension de la MJC pour la création de bureaux administratifs pour la Mairie et la police municipale lot 3 Menuiserie Alu

€52k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 3 September 2020 · ended around December 2021 · 15 months

That is at most ~€42k a year on average: a maximum too.

Company selected

Plac OiConstruction d'autres bâtiments · registered office Koungou (97600) · SIREN 094127123

Number 28 by amount of the 31 contracts Dembeni published for 2020. It belongs to the policy Public safety.

Other contracts of Plac Oi in Dembeni

Travaux de réparation des dégâts après Chido école t19 iloni2025 · maximum over 18 months96€kAmélioration thermique des écoles de Dembéni, école primaire…2024 · maximum over 2 months240€kConstruction dun groupe scolaire de 19 salles de class T19 lot no11…2020 · maximum over 5 months222€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.