Public contracts of Dembeni · 2023 · Construction and buildings

Réalisation des travaux de densification du groupe scolaire T22-Macro

Basse tension

€173k
maximum contract amount over 2 years — what was paid on it is not published
Signed on 6 March 2023 · ended around March 2025 · 2 yrs

That is at most ~€87k a year on average: a maximum too.

Company selected

Sogea MayotteConstruction de réseaux pour fluides · registered office Mamoudzou (97600) · SIREN 099382921

Number 15 by amount of the 46 contracts Dembeni published for 2023. It belongs to the policy Schools.

Other contracts of Sogea Mayotte in Dembeni

Aménagement du lotissement Ongojou, stade 2 : réseaux secs2019 · maximum over 6 months221€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.