Skip to main content

Public contracts of the Vosges département · 2021

Reconstruction du collège du BAN de vagney

Terrassement voirie et réseaux divers gros oeuvre

€2.3M
maximum contract amount over 20 months — what was paid on it is not published
Signed on 22 March 2021 · ended around November 2022 · 20 months

That is at most ~€1.4M a year on average: a maximum too.

Company selected

PeduzziTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Fresse-Sur-Moselle (88160) · headcount 100 to 199 employees · SIREN 305850646

A contract awarded to 2 holders; above, the main holder. With it: Peduzzi TP. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 13 by amount of the 81 contracts the Vosges département published for 2021.

Other contracts of Peduzzi in Vosges

Aménagement d’un abri a sel au centre d’exploitation secondaire de la…2023 · maximum over 9 months293€kTravaux d’aménagement de locaux et construction d’une extension…2022 · maximum over 17 months335€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : 8

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.