Supplier of Dijon · Construction and buildings
Curot Construction Facility Services
Curot Construction Facility Services holds 2 public contracts awarded by Dijon between 2019 and 2021. That is 2% of the value of the contracts the town awarded over the period.
head office in Longvic (21) · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 802828665
€144k
at most, over the whole term of the contracts awarded by Dijon in 2021
Its contracts in Dijon
Maximum amount of each contract, over its whole term: not what was paid.
Rénovation énergétique du groupe scolaire Buffon2021 · maximum over 18 months · at most ~€96k a year on average · Simplified procedure€144kRénovation technique et thermique de la piscine des Grésilles2019 · maximum over 12 months · Simplified procedure€215kYear by year
2021€144 k
2019€215 k