Public contracts of Dole · 2021 · Construction and buildings
Rénovation des menuiseries extérieures de l’hôtel de ville
That is at most ~€132k a year on average: a maximum too.
Company selected
C 3 B (Jurametal)Construction d'autres bâtiments · registered office Fontaine-Les-Dijon (21121) · headcount 200 to 249 employees · SIREN 331800581A contract awarded to 2 holders; above, the main holder. With it: Menuiserie Peguillet. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 2 by amount of the 43 contracts Dole published for 2021. It belongs to the policy Administration and shared services.
Other contracts of C 3 B (Jurametal) in Dole
Poiset2025 · maximum over 1 month99€kRéfection du parking des Terreaux à Dole2025 · maximum over 4 months6€kRénovation des gymnases COSEC et Tournier : menuiseries2020 · maximum over 2 years161€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.