Skip to main content

Public contracts of Donzenac · 2022 · Construction and buildings

Rénovation bloc sanitaire camping

Gros-oeuvre/Maçonnerie/Ravalement

€17k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 21 July 2022 · ended around October 2022 · 3 months

Company selected

Baron StephaneTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Uzerche (19140) · headcount 10 to 19 employees · SIREN 404501777

Number 15 by amount of the 23 contracts Donzenac published for 2022.

Other contracts of Baron Stephane in Donzenac

Gymnase2023 · maximum over 8 months82€kRénovation énergétique vestiaire2022 · maximum over 6 months25€kRénovation énergétique vestiaire2022 · maximum over 6 months6€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.