Skip to main content

Public contracts of Drancy · 2022 · Construction and buildings

Maintenance des disconnecteurs (BDC)

€80k
maximum contract amount over 4 years — what was paid on it is not published
Signed on 21 December 2022 · running until about December 2026 · 4 yrs
Ongoing21 Dec 2026

That is at most ~€20k a year on average: a maximum too.

Company selected

Terideal Segex Énergies (Setralec/ Ad Pompes/ Aquagreen)Travaux d'installation d'eau et de gaz en tous locaux · registered office Wissous (91320) · headcount 200 to 249 employees · SIREN 788056463

A contract awarded to 2 holders; above, the main holder. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 88 by amount of the 174 contracts Drancy published for 2022.

Other contracts of Terideal Segex Énergies (Setralec/ Ad Pompes/ Aquagreen) in Drancy

BPU-Maintenance des fontaines à boire,décoratives…2025 · maximum over 4 years2.2€MBPU Maintenance des systèmes d’arrosage/maintenance corrective2025 · maximum over 4 years800€kDPGF Maintenance des fontaines à boire,décoratives…2025 · maximum over 4 years501€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 5

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.