Skip to main content

Public contracts of Dunkerque · 2020 · Construction and buildings

Travaux d’isolation de l’école maternelle du parc malo

Isolation · Faux plafonds · Peintrue

€52k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 14 May 2020 · ended around September 2020 · 4 months

Company selected

EcoplafTravaux de plâtrerie · registered office Wormhout (59470) · headcount 6 to 9 employees · SIREN 502777188

Number 98 by amount of the 114 contracts Dunkerque published for 2020. It belongs to the policy Schools.

Other contracts of Ecoplaf in Dunkerque

Travaux isolation école château d’eau a Dunkerque centre2024 · maximum over 5 months202€kTravaux d’isolation de la salle de sport racine2023 · maximum over 5 months220€kTravaux d’isolation de la salle de sport Racine2023 · maximum over 5 months220€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.