Public contracts of Dzaoudzi · 2021 · Construction and buildings
Elaboration du schéma directeur des écoles
That is at most ~€40k a year on average: a maximum too.
Company selected
Etude Technique GénéraleIngénierie, études techniques · registered office Dembeni (97660) · SIREN 024044232A contract awarded to 2 holders; above, the main holder. With it: Oyat Architectes. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 34 by amount of the 61 contracts Dzaoudzi published for 2021.
Other contracts of Etude Technique Générale in Dzaoudzi
Maîtrise d’Oeuvre Rénovation de 15 salles de classes élémentaires LAZA…2022 · maximum over 12 months56€kMaîtrise d’oeuvre à l’extension et à la restructuration de la…2021 · maximum over 3 years74€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.