Skip to main content

Public contracts of Étaples · 2022 · Construction and buildings

Extension de l’école élémentaire jean moulin et extension de l’école primaire rombly : création d’un espace plurivalent avec intégration d’une cuisine satelitte

Menuiseries exterieures

€93k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 9 November 2022 · ended around January 2023 · 2 months

Company selected

SAS LavogezTravaux de menuiserie bois et PVC · registered office Preures (62650) · headcount 20 to 49 employees · SIREN 812304772

Number 24 by amount of the 72 contracts Étaples published for 2022. It belongs to the policy Schools.

Other contracts of SAS Lavogez in Étaples

Extension de l’école élémentaire Jean Moulin…2022 · maximum over 10 months93€kExtension de l’école maternelle de rombly en vue de la création d’un…2020 · maximum over 6 months14€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.