Public contracts of Étaples · 2022 · Construction and buildings
Extension de l’école élémentaire jean moulin et extension de l’école primaire rombly : création d’un espace plurivalent avec intégration d’une cuisine satelitte
Plâtrerie / isolation
Company selected
R2C Renovation des 2 CapsConstruction de maisons individuelles · registered office Marquise (62250) · headcount 3 to 5 employees · SIREN 832614044Number 39 by amount of the 72 contracts Étaples published for 2022. It belongs to the policy Schools.
Other contracts of R2C Renovation des 2 Caps in Étaples
Extension de l’école élémentaire Jean Moulin…2022 · maximum over 10 months70€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.