Supplier of Étival-Clairefontaine · Construction and buildings
Miller Carrelage
Miller Carrelage holds one public contract awarded by Étival-Clairefontaine in 2023. That is 4% of the value of the contracts the town awarded in 2023.
head office in Raon-L'Etape (88) · 3 to 5 employees · Commerce de détail de quincaillerie, peintures et verres en petites surfaces (moins de 400 m²) · SIREN 838873065
Its contracts in Étival-Clairefontaine
Maximum amount of each contract, over its whole term: not what was paid.
Construction d’un groupe scolaireRevetements de sols · 2023 · maximum over 16 months · at most ~€157k a year on average · Simplified procedure€210kRegions, départements, intercommunalities
Miller Carrelage holds contracts awarded by one of these bodies, worth €36k.
Elsewhere in France
Miller Carrelage holds contracts in 6 towns, worth €391k at award.