Public contracts of Évry-Courcouronnes · 2024
Remplacement de la couverture de l’école élémentaire du groupe scolaire levasseur
Number 41 by amount of the 264 contracts Évry-Courcouronnes awarded in 2024.
Contract · Construction and Bâtiment · Travaux · carried out in 91000 · environmental clauses
891k €
contract ceiling — what was paid on it is not published
Who won it
Cilg ConstructionSIREN 484201272The competition
1 bid received
Adapted procedure · awarded to 1 company
Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.
The form of the contract
PriceForfaitaire
Published amendments1
Subcontracting declaredno
Environmental considerationsCritère environnemental, Clause environnementale
The 3 lots
Lot 13 September 2024311k€
Lot 27 June 2024 · 1 bid290k€
Lot 310 June 2024 · 1 bid290k€
Other contracts of Cilg Construction in Évry-Courcouronnes
Reconstruction ALSH & rehabilit restauration gs g. la pierre20262.3M€Marche de substitution suite à la resiliation du marché initial relatif à la RECONSTRUCTION DU POLE ENFANCE ET REHABILITATION DE LA RESTAURATION DU GROUPE SCOLAIRE GEORGES LA PIERRE - LOT 3…20252.4M€Marché substitution suite a la résiliation du marché avec le titulaire initiale reconst. ALSH & restau. gs g. la pierre20251.2M€Relance du lot 1 : démolition et désamiantage- fondations - gros oeuvre- revêtement suite a déclaration sans-suite du marché de trvaux de reconstruction du pôle enfance et réhabilitation de la…20242.2M€Marchés de plus de 40 000 € HT déclarés à la notification (DECP) : montants des contrats, pas les paiements. Les plus petits marchés ne sont pas publiés ; les montants manifestement erronés sont écartés.