Skip to main content

Public contracts of Évry-Courcouronnes · 2023 · Construction and buildings

Travaux de construction du centre socioculturel pyramides

€405k
maximum contract amount over 3 years — what was paid on it is not published
Signed on 13 February 2023 · ended around February 2026 · 3 yrs

That is at most ~€135k a year on average: a maximum too.

Company selected

Doumer SolsTravaux de revêtement des sols et des murs · registered office Meulan-En-Yvelines (78250) · headcount 20 to 49 employees · SIREN 669804379

Number 75 by amount of the 197 contracts Évry-Courcouronnes published for 2023.

Other contracts of Doumer Sols in Évry-Courcouronnes

Travaux de construction de l’école Horizon2025 · maximum over 4 months133€kTravaux de construction de l’école Horizon2025 · maximum over 4 months133€kTravaux de construction du centre socioculturel pyramides2023 · maximum over 19 months440€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Mixte

Published amendments : 6

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.