Skip to main content

Public contracts of Évry-Courcouronnes · 2023 · Construction and buildings

Travaux de construction du centre socioculturel pyramides

Bois sauvage

€385k
maximum contract amount over 19 months — what was paid on it is not published
Signed on 13 February 2023 · ended around September 2024 · 19 months

That is at most ~€243k a year on average: a maximum too.

Company selected

BathelecTravaux d'installation électrique dans tous locaux · registered office Saint-Denis (93200) · headcount 100 to 199 employees · SIREN 438765083

Number 78 by amount of the 197 contracts Évry-Courcouronnes published for 2023.

Other contracts of Bathelec in Évry-Courcouronnes

Plâtrerie aux plafonds2023 · maximum over 3.5 years586€kTravaux de construction d’un pôle enfance au parc des loges…2023 · maximum over 17 months574€kTravaux de construction du centre socioculturel pyramides2023 · maximum over 3 years441€k
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.