Skip to main content

Public contracts of Feurs · 2019 · Construction and buildings

Restructuration des voiries

€5M
maximum contract amount over 4 years — what was paid on it is not published
Signed on 7 January 2019 · ended around January 2023 · 4 yrs

That is at most ~€1.3M a year on average: a maximum too.

Company selected

Eurovia Drome Ardeche Loire AuvergneConstruction de routes et autoroutes · registered office Saint-Jean-Bonnefonds (42650) · headcount 500 to 999 employees · SIREN 317975910

The largest of the 3 contracts Feurs published for 2019. It belongs to the policy Streets and transport.

Other contracts of Eurovia Drome Ardeche Loire Auvergne in Feurs

Travaux aménagement du parc des bords de loire2025 · maximum over 4 months119€kRestructuration des voiries2023 · maximum over 4 years5€M
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.