Public contracts of Fismes · 2025 · Construction and buildings
Revêtement de façade
Construction maison de santé
That is at most ~€44k a year on average: a maximum too.
Who won it
S.R.B.I.Travaux de maçonnerie générale et gros œuvre de bâtiment · registered office Cernay-Les-Reims (51420) · headcount 10 to 19 employees · SIREN 804960714Number 20 by amount of the 28 contracts Fismes published for 2025. It belongs to the policy Health and social care.
Other contracts of S.R.B.I. in Fismes
Pierre collée et enduit2025 · maximum over 16 months54€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Forfaitaire
Published amendments : 2
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.