Supplier of Fleury · Construction and buildings
SARL Manuel Cutillas
SARL Manuel Cutillas holds 3 public contracts awarded by Fleury in 2025. That is 6% of the value of the contracts the town awarded in 2025.
head office in Narbonne (11) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 317686327
Its contracts in Fleury
Maximum amount of each contract, over its whole term: not what was paid.
Construction d’un local associatif place des pêcheurs aux cabanes de…Démolition · Gros oeuvre · 2025 · maximum over 7 months · Simplified procedure€130k01 Construction local associatifGros oeuvre · 2025 · maximum over 7 months · Simplified procedure€122k02 Construction capitainerieGros oeuvre · 2025 · maximum over 7 months · Simplified procedure€110kRegions, départements, intercommunalities
SARL Manuel Cutillas holds contracts awarded by one of these bodies, worth €1.8M.
Elsewhere in France
SARL Manuel Cutillas holds contracts in 3 towns, worth €10.2M at award.