Supplier of Galgon · Construction and buildings
Girard
Girard holds 2 public contracts awarded by Galgon in 2025. That is 22% of the value of the contracts the town awarded in 2025.
head office in Savignac-De-L'Isle (33) · 10 to 19 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 344916804
Its contracts in Galgon
Maximum amount of each contract, over its whole term: not what was paid.
Création d’un centre médical et paramédical2025 · maximum over 14 months · at most ~€238k a year on average · 2 lots · Simplified procedure€278kElsewhere in France
Girard holds contracts in 2 towns, worth €415k at award.