Public contracts of Gap · 2024 · Construction and buildings
Construction petite crèche 24 places terrassement gros oeuvre maçonnerie démolition partielle réseaux divers muret de propreté
That is at most ~€188k a year on average: a maximum too.
Company selected
Metebele ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Gap (05000) · headcount 6 to 9 employees · SIREN 911732832The competition
Median for this procedure in 2024: 3 bids, across 48741 comparable contracts. Simplified procedure · awarded to 1 company
Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.
Number 39 by amount of the 128 contracts Gap published for 2024. It belongs to the policy Health and social care.
Other contracts of Metebele Construction in Gap
Travaux de construction d’un skatepark2025 · maximum over 11 months327€kTravaux de construction d’un abattoir avicole2025 · maximum over 6 months300€kTravaux de construction d’un abattoir avicole2025 · maximum over 6 months267€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Mixte
Published amendments : 1
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.