Skip to main content

Public contracts of Gap · 2024 · Construction and buildings

Construction petite crèche 24 places terrassement gros oeuvre maçonnerie démolition partielle réseaux divers muret de propreté

€203k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 22 October 2024 · ended around November 2025 · 13 months

That is at most ~€188k a year on average: a maximum too.

Company selected

Metebele ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Gap (05000) · headcount 6 to 9 employees · SIREN 911732832

The competition

4 bids received

Median for this procedure in 2024: 3 bids, across 48741 comparable contracts. Simplified procedure · awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 39 by amount of the 128 contracts Gap published for 2024. It belongs to the policy Health and social care.

Other contracts of Metebele Construction in Gap

Travaux de construction d’un skatepark2025 · maximum over 11 months327€kTravaux de construction d’un abattoir avicole2025 · maximum over 6 months300€kTravaux de construction d’un abattoir avicole2025 · maximum over 6 months267€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.