Skip to main content

Public contracts of Gap · 2024 · Construction and buildings

Réhabilitation de la gare

Démolition gros oeuvre VRD espaces verts

€130k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 17 April 2024 · ended around October 2025 · 18 months

That is at most ~€87k a year on average: a maximum too.

Company selected

PMTP 05Travaux de terrassement courants et travaux préparatoires · registered office Gap (05000) · headcount 10 to 19 employees · SIREN 533678306

Number 52 by amount of the 128 contracts Gap published for 2024. It belongs to the policy Town planning and housing.

Other contracts of PMTP 05 in Gap

Réfection et création de trottoirs et de cheminements piétons2025 · maximum over 4 years3.2€MRéhabilitation beauregard voirie et réseaux divers / espaces verts2024 · maximum over 18 months193€kRéhabilitation de l’école de bellevue2023 · maximum over 9 months146€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Unitaire

Published amendments : 2

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.