Skip to main content

Public contracts of Gap · 2020 · Construction and buildings

Restructuration extension conservatoire

Faux plafonds doublage thermique cloisons flocage

€106k
maximum contract amount over 11 months — what was paid on it is not published
Signed on 2 July 2020 · ended around June 2021 · 11 months

Company selected

OcalTravaux de peinture et vitrerie · registered office Gap (05000) · headcount 10 to 19 employees · SIREN 482067527

Number 42 by amount of the 65 contracts Gap published for 2020. It belongs to the policy Culture, sport and youth.

Other contracts of Ocal in Gap

Trx dans les bâtiments cloisons2024 · maximum over 2.5 years300€kRéhabilitation de la gare2024 · maximum over 18 months49€kRéhabilitation de l’école de bellevue2023 · maximum over 7 months74€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.