Supplier of Garancières-en-Beauce · Construction and buildings
2EC Elec
2EC Elec holds 2 public contracts awarded by Garancières-en-Beauce between 2022 and 2024. That is 10% of the value of the contracts the town awarded over the period.
head office in Courcelles-Le-Roi (45) · 10 to 19 employees · Travaux d'installation électrique dans tous locaux · SIREN 507674364
Its contracts in Garancières-en-Beauce
Maximum amount of each contract, over its whole term: not what was paid.
Travaux d’extension de la Salle des GarancesÉlectricité courants forts et faibles · 2024 · maximum over 12 months · Simplified procedure€48kConstruction d’un pavillon individuelChauffage ventilation plomberie · Électricité · 2022 · maximum over 12 months · Simplified procedure€42kYear by year
Elsewhere in France
2EC Elec holds contracts in 5 towns, worth €283k at award.