Supplier of Garges-lès-Gonesse · Construction and buildings
Delta Menuiserie Design
Delta Menuiserie Design holds 2 public contracts awarded by Garges-lès-Gonesse in 2022. That is 2% of the value of the contracts the town awarded in 2022.
head office in Sarcelles (95) · Fabrication d'éléments en matières plastiques pour la construction · SIREN 828049676
€3.3M
at most, over the whole term of the contracts awarded by Garges-lès-Gonesse in 2022
Its contracts in Garges-lès-Gonesse
Maximum amount of each contract, over its whole term: not what was paid.
Reprise des travaux de réhabilitation des façades de l’Hôtel de Ville2022 · maximum over 5 months · Negotiated, no advert or competition€1.6MReprise des travaux de réhabilitation des façades de HDV2022 · maximum over 5 months · Simplified procedure€1.6M