Geispolsheim: where the money goes
The public contracts of Geispolsheim
Up to €611k: the maximum amount of the public contracts signed in 2025, over their whole term.
4 contracts in 2025 · €8.3M published from 2018 to 2026. Maximum amounts planned.
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid.
Contracts signed by year
Click a year to see its contracts
Purchases by category, 2018–2026
Click a category to see its contracts
Main contracts of 2025
Click a contract to see its fiche
- Éclairage public 2025Soc Électricité Eclairage Illuminationup to €265k
- Maintenance de l’éclairage publicSpie Citynetworksup to €180k
- Étanchéité toiture-terrasse centre sportif basketSoprema Entreprisesup to €103k
- Création aire de jeux rue des suedoisThierry Muller (Espace Vert/Jardins Rietsch) · 2 holders, whole-contract amountup to €63k
Main suppliers, 2018–2026
Click a company to see its contracts
- Spie Citynetworks8 contractsup to €1.5M
- Serrurerie Heitz2 contractsup to €618k
- Girold Constructions Bois2 contractsup to €409k
- Eiffage Énergie Systemes - Lohner (Lohner)1 contractup to €350k
- Tradi1 contractup to €342k
- Soc Électricité Eclairage Illumination1 contractup to €265k
- Sarlat et Compagnie1 contractup to €231k
- Etude Realisation Industriel Acoustique (Serial)2 contractsup to €223k
The 42 other suppliers
- Thierry Muller (Espace Vert/Jardins Rietsch)3 contractsup to €208k
- Entreprise de Construction Wimmer1 contractup to €195k
- Tempasset (Lauralu Fabrication Structures)1 contractup to €173k
- Entreprise Hirtzel-Arbogast & Fils (Hirtzel-Arbogast & Fils)1 contractup to €173k
- Établissements Robert Geistel2 contractsup to €173k
- Entreprise Galopin1 contractup to €173k
- Sib Études Structure Ingenierie Bâtiment1 contractup to €171k
- Martin Fils1 contractup to €169k
- Entreprise Charles Bilz SA2 contractsup to €165k
- Mayart1 contractup to €158k
- Metalest1 contractup to €155k
- Real Toiture (Benhasna Ets)1 contractup to €152k
- Cta Énergies1 contractup to €136k
- Tir Technologies Toiles Indus Rhin Techn1 contractup to €130k
- Diebold et Fils1 contractup to €120k
- Atalu1 contractup to €110k
- Ader1 contractup to €109k
- Climat Est (Esprit-Clim Travaux)1 contractup to €109k
- Bureau d'Études Ruble Nicli et Associes1 contractup to €105k
- SARL Crepis Rhin (Crepis Rhin)1 contractup to €105k
- Électricité Vincentz Nord-Alsace (Noe Nouvelles Énergies - Groupe Vin)1 contractup to €104k
- Soprema Entreprises1 contractup to €103k
- Fehr Groupe1 contractup to €97k
- Decopeint2 contractsup to €87k
- Électricité Veit1 contractup to €80k
- Schaf Elec1 contractup to €76k
- Norba Alsace1 contractup to €74k
- Est Paysages d'Alsace1 contractup to €70k
- Electrification Industrielle de l'Est1 contractup to €67k
- Société Koenig1 contractup to €67k
- Reatech (Ruiu)1 contractup to €60k
- France Solar (Batinote)1 contractup to €58k
- Entreprise Leon1 contractup to €57k
- MPS Toilettes Automatiques1 contractup to €55k
- Sibold Successeurs SAS1 contractup to €54k
- Abry Arnold SA1 contractup to €54k
- Olry Cloisons1 contractup to €49k
- BTP Steger1 contractup to €44k
- Altitude Echafaudage1 contractup to €43k
- Klipfel et Fils1 contractup to €43k
- Geosat1 contractup to €41k
- MJP Bensoussan1 contractup to €39k
Understanding these figures
What does a contract’s amount measure?
A contract’s amount is the maximum allowed over its whole term, often several years: it is not what the town spends in the year. The lots of one contract are grouped.
Where do these figures come from?
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.
Source: Public procurement — DECP (data.gouv.fr) ↗, consolidated and checked by Colin Maudry (colibre.fr ↗)