Public contracts of Gières · 2022 · Construction and buildings

Construction d’un restaurant scolaire

€90k
maximum contract amount over 15 months — what was paid on it is not published
Signed on 7 November 2022 · ended around February 2024 · 15 months

That is at most ~€72k a year on average: a maximum too.

Company selected

Electric Tolerie (Techno-Alpes Énergie)Conception d'ensemble et assemblage sur site industriel d'équipements de contrôle des processus industriels · registered office Echirolles (38130) · headcount 10 to 19 employees · SIREN 072502982

Number 7 by amount of the 15 contracts Gières published for 2022. It belongs to the policy Schools.

Other contracts of Electric Tolerie (Techno-Alpes Énergie) in Gières

Réhabilitation thermique de l’école René Cassin2024 · maximum over 4 months19€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.