Supplier of Gondrin · Construction and buildings
Lisbani
Lisbani holds 2 public contracts awarded by Gondrin in 2023. That is 22% of the value of the contracts the town awarded in 2023.
head office in Gondrin (32) · 3 to 5 employees · Travaux de charpente · SIREN 753871631
€128k
at most, over the whole term of the contracts awarded by Gondrin in 2023
Its contracts in Gondrin
Maximum amount of each contract, over its whole term: not what was paid.
Charpente, couverture, zinguerie2023 · maximum over 17 months · at most ~€49k a year on average · Simplified procedure€69kOssature bois2023 · maximum over 14 months · at most ~€51k a year on average · Simplified procedure€59kElsewhere in France
Lisbani holds contracts in 2 towns, worth €198k at award.