Skip to main content

Public contracts of Guipavas · 2022 · Professional services

Construction de l’école maternelle Pergaud et des locaux périscolaires : mission MO

€746k
maximum contract amount over 3.5 years — what was paid on it is not published
Signed on 20 June 2022 · ended around January 2026 · 3.5 yrs

That is at most ~€208k a year on average: a maximum too.

Company selected

Auas IngénierieIngénierie, études techniques · registered office Rennes (35000) · headcount 20 to 49 employees · SIREN 322537705

A contract awarded to a consortium of 6 holders; above, the main holder. With it: Archipole Urbanisme et Architecture, Alhyange - Socotec Smart Solutions, Kegin Ingénierie, Bureau d'Étude Cooperatif pour la Maitrise de l'Énergie 29. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 98 contracts Guipavas published for 2022. It belongs to the policy Schools.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.