Public contracts of Haguenau · 2021 · Construction and buildings

Maison des sports démolition et reconstruction d’un dojo

Chauffage ventilation

€306k
maximum contract amount over 20 months — what was paid on it is not published
Signed on 19 January 2021 · ended around September 2022 · 20 months

That is at most ~€184k a year on average: a maximum too.

Who won it

Établissements HoulleTravaux d'installation d'équipements thermiques et de climatisation · registered office Sarreguemines (57200) · headcount 50 to 99 employees · SIREN 424954618

A contract awarded to 2 holders; above, the main holder. With it: Établissements Houlle. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 23 by amount of the 100 contracts Haguenau published for 2021. It belongs to the policy Culture, sport and youth.

Other contracts of Établissements Houlle in Haguenau

Gymnase kleber travaux de démolition et de reconstruction2022 · maximum over 19 months349€kGymnase Kléber : travaux de démolition et de reconstruction2022 · maximum over 17 months346€kMaison des sports démolition et reconstruction d’un dojo2022 · maximum over 10 months81€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.