Société d'Architecture Hyperbole
Société d'Architecture Hyperbole holds one public contract awarded by Hautmont in 2025.
head office in Le Quesnoy (59) · 3 to 5 employees · Activités d'architecture · SIREN 893450692
€45k
at most, over the whole term of the contracts awarded by Hautmont in 2025
Its contracts in Hautmont
Maximum amount of each contract, over its whole term: not what was paid.
Maîtrise d’œuvre pour les travaux de construction d’un boulodrome2025 · maximum over 5 months · Simplified procedure€45k