Supplier of Houilles · Construction and buildings
Société Tino R-C
Société Tino R-C holds 7 public contracts awarded by Houilles between 2024 and 2025. That is 2% of the value of the contracts the town awarded over the period.
head office in Carrieres-Sur-Seine (78) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 397536376
Its contracts in Houilles
Maximum amount of each contract, over its whole term: not what was paid.
Mise en conformité du pavillon du parc charles de gaulle2025 · maximum over 1 month · Simplified procedure€90kTX platrerie2024 · maximum over 12 months · Simplified procedure€171kPlâtrerie2024 · maximum over 17 months · at most ~€83k a year on average · Simplified procedure€118kTx de réhabilitation école allende2024 · maximum over 12 months · Simplified procedure€109kTx menuiseries intérieures2024 · maximum over 12 months · Simplified procedure€107kYear by year
Elsewhere in France
Société Tino R-C holds contracts in 3 towns, worth €1.2M at award.