Construction d’une station d’épuration des eaux usées sur l’île de Batz

€2.4M
maximum contract amount over 17 months — what was paid on it is not published
Signed on 5 April 2024 · ended around September 2025 · 17 months

That is at most ~€1.7M a year on average: a maximum too.

Company selected

CNR ConstructionTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Pleumeleuc (35137) · headcount 100 to 199 employees · SIREN 026950055

A contract awarded to 3 holders; above, the main holder. With it: Barillec SAS, Hydrea. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Unitaire

Published amendments : none

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.