Skip to main content

Public contracts of Ingré · 2020 · Construction and buildings

Travaux de rénovation des sanitaires filles/garçons de l’école élémentaire du moulin a Ingré

€11k
maximum contract amount over 2 months — what was paid on it is not published
Signed on 29 April 2020 · ended around June 2020 · 2 months

Company selected

Gauthier SATravaux de peinture et vitrerie · registered office Orleans (45100) · headcount 50 to 99 employees · SIREN 085880615

Number 9 by amount of the 11 contracts Ingré published for 2020. It belongs to the policy Schools.

Other contracts of Gauthier SA in Ingré

Aménagement de deux cabinets médicaux dans le garage du Centre…2026 · maximum over 3 months44€kRénovation des sanitaires extérieurs de l’école élémentaire victor hugo…2025 · maximum over 4 months30€kConstruction et réhabilitation d’un pôle culturel à Ingré2024 · maximum over 17 months372€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

The 2 lots : 7 €k · 4 €k

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.