
Var · Provence-Alpes-Côte d'Azur · 123,220 residents · Chair: Frédéric Masquelier
Communauté d'agglomération Estérel Côte d'Azur Agglomération
€154.8 million spent in 2025.
€1,256 per resident · Urban-area groupings of the same size: €702
What Communauté d'agglomération Estérel Côte d'Azur Agglomération spends, by policy
The 4 other items (4%)
Source: 2025 accounts of Communauté d'agglomération Estérel Côte d'Azur Agglomération (DGFiP), by public policy.
Where the money goes
The €154.8M spent in 2025, by who receives it.
Source: 2025 accounts of Communauté d'agglomération Estérel Côte d'Azur Agglomération (DGFiP).
Contracts state a maximum amount for their whole term, often several years. That amount differs from what was paid. Purchases, services and works paid to companies by the intercommunality in 2025: €89.4M (its accounts).
- Soc Rapha Bâtiment Travaux Publics5 contracts over 1 month to 13 months · at most ~€10.3M a year on averageup to €10.6M
- Propolys1 contract over 4 years · at most ~€1.5M a year on averageup to €6M
- Électricité Industrielle J. P. Fauche1 contract over 4 years · at most ~€506k a year on average · framework agreement: maximum envelopeup to €2M
- Études Pluridisciplinaires et Conseils1 contract over 4 years · at most ~€421k a year on averageup to €1.7M
- Ent Gen Travaux Électrique Serradori Cie3 contracts over 4 months to 12 months · at most ~€1.3M a year on averageup to €1.3M
- Tee Paysage Travaux et Entretien Paysage1 contract over 12 monthsup to €1.2M
- Mediterranee Environnement1 contract over 4 monthsup to €1.2M
36 contracts signed in 2025 · €30.1M before tax
Why this total differs from the €89.4M of purchases, services and works paid to companies
These are the amounts of the contracts signed in the year, over their whole length, not what was paid. The money paid in a year also goes to older contracts and to purchases too small to be published (under €40,000 excl. VAT). For a framework agreement, the amount is a ceiling.
Investment and works
€38.3M of capital spending in 2025 (building, renovation, equipment), €311 per resident. Urban-area groupings of the same size: €114.
Click a building site to see the contract
- Marché subséquent 1-revêtement2024–2025 · Soc Rapha Bâtiment Travaux Publics€5.5M
- Construction du barrage de l’Aspe2023 · Soc Rapha Bâtiment Travaux Publics€5M
- Aménagement de la promenade des bains espaces verts2024 · Tee Paysage Travaux et Entretien Paysage€4.3M
- Travaux de voirie et réseaux divers génie civil et voirie sur le territoire Ecaa2024 · Soc Rapha Bâtiment Travaux Publics€4M
- Construction dun mur darrière-plage le long du boulevard dALGER…2025 · Soc Rapha Bâtiment Travaux Publics€3.9M
Largest works contracted since 2023, among published contracts. Amounts planned at signature, often spread over several years.
On top of that, €11.7M paid to other bodies for their own equipment (towns, intercommunalities, associations…).
Source: 2025 accounts of Communauté d'agglomération Estérel Côte d'Azur Agglomération (DGFiP), by public policy.
Revenue and financing
Revenue: €118.2M · borrowing: €44.9M · spending: €154.8M.
Source: OFGL, 2025 accounts of the main budget.
Debt and taxes
€1,505 of debt per resident
Urban-area groupings of the same size: €781
11 years of savings to repay it
€61 of local taxes per resident
Urban-area groupings of the same size: €49
2025 accounts. Debt and taxes: OFGL, consolidated (main and side budgets). Per resident: amount divided by the population (Insee). “Urban-area groupings of the same size”: median of the 94 urban-area groupings of 100,000 to 365,000 residents.
The levels above Communauté d'agglomération Estérel Côte d'Azur Agglomération
Spending per resident in 2025, and what each level pays for.
- IntercommunalityCommunauté d'agglomération Estérel Côte d'Azur AgglomérationWaste, water, urban transport, economic development€1,256 per resident
- DépartementVarMinimum income, elderly and disability care, middle schools, county roads€1,255 per resident
- RegionProvence-Alpes-Côte d'AzurHigh schools, regional trains, training, business support€558 per resident
Each amount is what the body spends per resident, from its accounts (DGFiP). Do not add them up: part of the money passes from one body to another.
Who is part of Communauté d'agglomération Estérel Côte d'Azur Agglomération
Understanding these figures
Who does what
The intercommunality collects and treats waste, often runs water and sanitation, organises urban transport, and pays part of its revenue back to its member towns.
Why the levels are not added up
The same euro can appear twice: once when a region or a département pays a grant, again when the town spends it. Each page shows its own body’s spending.
Where these figures come from
Spending: the accounts of the main budget published by the DGFiP, by public policy. Revenue, debt and taxes: OFGL. Contracts: published contract data (DECP), amounts planned at signing.
Elected officials and staff of Communauté d'agglomération Estérel Côte d'Azur Agglomération: to report a figure to correct or add context, write to Qipu.
Page edited by Qipu, independent of Communauté d'agglomération Estérel Côte d'Azur Agglomération · Sources and method
Accounts 2025 (DGFiP, OFGL). The method · See the source