Skip to main content

Public contracts of Isle · 2020 · Construction and buildings

Menuiseries extérieures aluminium et occultations

Construction salle multifonctionnelle

€113k
maximum contract amount over 18 months — what was paid on it is not published
Signed on 20 November 2020 · ended around May 2022 · 18 months

That is at most ~€76k a year on average: a maximum too.

Company selected

Société Nouvelle Miroiterie GBM (Miroiterie GBM)Façonnage et transformation du verre plat · registered office Isle (87170) · headcount 20 to 49 employees · SIREN 537446551

Number 9 by amount of the 17 contracts Isle published for 2020.

Other contracts of Société Nouvelle Miroiterie GBM (Miroiterie GBM) in Isle

Travaux d’extension du club house du Tennis à Isle2025 · maximum over 4 months14€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.