Public contracts of Issoire · 2020 · Construction and buildings
Mise hors d’eau du bâtiment Pomel après incendie : reconstruction de la toiture
That is at most ~€437k a year on average: a maximum too.
Company selected
Soredal AuvergneTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office La Roche-Blanche (63670) · headcount 10 to 19 employees · SIREN 353815863A contract awarded to 2 holders; above, the main holder. With it: Louis Geneste. The amount is the whole contract’s: the DECP does not publish each holder’s share.
Number 5 by amount of the 79 contracts Issoire published for 2020. It belongs to the policy Public safety.
Contract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : 2
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.