Skip to main content

Public contracts of Issoire · 2022 · Construction and buildings

Travaux de réhabilitation du bâtiment abritant l’ancienne école de musique à Issoire

€105k
maximum contract amount over 8 months — what was paid on it is not published
Signed on 28 March 2022 · ended around November 2022 · 8 months

Company selected

G.MOUREAU et FilsTravaux d'installation d'eau et de gaz en tous locaux · registered office Issoire (63500) · headcount 10 to 19 employees · SIREN 411991755

Number 13 by amount of the 64 contracts Issoire published for 2022. It belongs to the policy Schools.

Other contracts of G.MOUREAU et Fils in Issoire

Chauffage ventil plomberie sanitaires2022 · maximum over 7 months105€kTravaux de réhabilitation de locaux sis 44/46 rue de la Berbiziale…2022 · maximum over 9 months41€kPlomberie sanitaire ventilation chauffage réversible2022 · maximum over 9 months41€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.