Supplier of Juignac · Construction and buildings
Chauffage Plomberie Carrara
Chauffage Plomberie Carrara holds one public contract awarded by Juignac in 2025. That is 82% of the value of the contracts the town awarded in 2025.
head office in Barbezieux-Saint-Hilaire (16) · 10 to 19 employees · Travaux d'installation d'eau et de gaz en tous locaux · SIREN 802543439
Its contracts in Juignac
Maximum amount of each contract, over its whole term: not what was paid.
Aménagement de deux logements dans le presbytère, rue Saint-Nazaire2025 · maximum over 11 months · Simplified procedure€69kRegions, départements, intercommunalities
Chauffage Plomberie Carrara holds contracts awarded by one of these bodies, worth €85k.