Skip to main content

Public contracts of Koungou · 2023 · Construction and buildings

2023/Ck/40-terrassement

Gros oeuvre · Travaux d’aménagement d’une passerelle d’accès au cimetière de kangani

€370k
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 24 May 2023 · ended around December 2025 · 2.5 yrs

That is at most ~€143k a year on average: a maximum too.

Company selected

Kaya SARLTravaux de terrassement courants et travaux préparatoires · registered office Sada (97640) · SIREN 798954640

Number 47 by amount of the 139 contracts Koungou published for 2023. It belongs to the policy Administration and shared services.

Other contracts of Kaya SARL in Koungou

2024/DGST/ck/10-réseaux secs et humides2024 · maximum over 8 months1.6€M2024/DGST/ck/08-terrassements-démolition et maçonnerie2024 · maximum over 8 months835€k2023/CK/34-Abris bacs à ordures village de Longoni2023 · maximum over 18 months288€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 3

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.